Connect technical requirements, inspection gates and handover evidence.
01 / PROPOSED QUALITY PLAN
01Material verification
+
Material designation, heat identity and approved requirements.
PROPOSED EVIDENCEMaterial certificate / composition results02Process & hardness
+
Treatment batch, hardness locations and specified limits.
PROPOSED EVIDENCETreatment / hardness report03Dimensions & visual
+
Critical dimensions, interfaces, surfaces and defect assessment.
PROPOSED EVIDENCEDimensional / inspection record04Assembly review
+
Part traceability, clearances, fastening and rotation.
PROPOSED EVIDENCEAssembly / clearance record05Test verification
+
Agreed pressure, performance, vibration or other checks.
PROPOSED EVIDENCESigned test report06Release & handover
+
Deviation closure, marking, packing and dossier completeness.
PROPOSED EVIDENCERelease note / dossier index02 / TESTING BOUNDARIES
BEHIND EVERY CURVE
THE TEST CONDITIONS
A clean-water test is not a slurry performance guarantee. Identify the medium, temperature, speed, impeller condition, instruments and calibration.
Pressure testing, NDE, balancing and third-party witnessing depend on the contract and inspection plan. Handover should cover traceability, agreed reports, approved drawings, operation and maintenance information, and spares.