PERGOMAN · MINERAL PROCESSING & TRANSPORT
Project enquiries
Home/Quality

QUALITY & VERIFICATION / PERGOMAN

RELIABILITY
NEEDS EVIDENCE

Connect technical requirements, inspection gates and handover evidence.

01 / PROPOSED QUALITY PLAN

REQUIREMENTSINSPECTIONEVIDENCERELEASE
01

Material verification

+

Material designation, heat identity and approved requirements.

PROPOSED EVIDENCEMaterial certificate / composition results
02

Process & hardness

+

Treatment batch, hardness locations and specified limits.

PROPOSED EVIDENCETreatment / hardness report
03

Dimensions & visual

+

Critical dimensions, interfaces, surfaces and defect assessment.

PROPOSED EVIDENCEDimensional / inspection record
04

Assembly review

+

Part traceability, clearances, fastening and rotation.

PROPOSED EVIDENCEAssembly / clearance record
05

Test verification

+

Agreed pressure, performance, vibration or other checks.

PROPOSED EVIDENCESigned test report
06

Release & handover

+

Deviation closure, marking, packing and dossier completeness.

PROPOSED EVIDENCERelease note / dossier index

02 / TESTING BOUNDARIES

BEHIND EVERY CURVE
THE TEST CONDITIONS

A clean-water test is not a slurry performance guarantee. Identify the medium, temperature, speed, impeller condition, instruments and calibration.

Pressure testing, NDE, balancing and third-party witnessing depend on the contract and inspection plan. Handover should cover traceability, agreed reports, approved drawings, operation and maintenance information, and spares.

FIND YOUR NEXT MOVE

What are you looking for